top of page

Paint by the numbers!

  • Jan 1, 2017
  • 1 min read

Ensuite new plaster given first coat thin wash.

En suite new plaster first coat seal wash.

Wallpaper feature wall to be stripped and prep'ed.

En suite new plaster ceiling wash.

Feature wall stripped and filled/caulked/undercoated.

Rewiring holes filled and undercoated with wash on new plaster.

Feature wall stripped and prep'ed.

French window wall prep'ed.

Ceiling matt white and cutting in for main walls.

Cutting in around fitted wardrobes and french windows.

Main walls second coat and skirts caulked and first coat white satin.

Windows/woodwork second coat white satin.

En suite second coat to walls and ceiling.

Bedroom done.

En suite done.

French window walls done and white satin to door frames etc.

En suite done and snagged.

En suite woodwork done and snagged.

Comments


Featured Posts
Recent Posts
Follow Us
Search By Tags
Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
In need of a Handyman in Trowbridge and the surrounding areas?
Get a free, no obligation estimate! 
Call: 07792 773756
  • Facebook Clean

© 2015 by Andy Man.

bottom of page